Skip to content

WTO notification · TBT

El SalvadorUpdated: check whether it is now adopted or in force

Petroleum handling equipment – El Salvador

Salvadoran Technical Regulation RTS 75.02.04:26 NATURAL GAS DISTRIBUTION THROUGH NETWORKS. DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE AND ABANDONMENT OR DEACTIVATION.

View original

Reglamento Técnico Salvadoreño RTS 75.02.04:26 DISTRIBUCIÓN DE GAS NATURAL POR REDES. DISEÑO, CONSTRUCCIÓN, OPERACIÓN, MANTENIMIENTO Y ABANDONO O DESACTIVACIÓN.

El Salvador issued an addendum on 24 September 2026 to the earlier TBT notification G/TBT/N/SLV/244. Addenda often report that a measure was adopted, changed, postponed or withdrawn. The measure was first notified on 18 September 2026. Comments are open until 17 November 2026.

Expodite puts notifications like this one in your Updates centre, matched to the HS codes of your products and the markets you export to. Opens the requirements check for El Salvador in your Expodite account.

Source: WTO ePing (opens in a new tab). Summaries by Expodite, which is independent of the WTO.

Published here:

Updated here:

At a glance

Products

Equipment for transport of petroleum, petroleum products and natural gas (ICS code(s): 75.200)

View original

Equipo de transporte de petróleo, de productos petrolíferos y de gas natural (Código(s) de la ICS: 75.200)

Notifying member
El Salvador
Status
Updated: check whether it is now adopted or in force
Objectives
  • Prevention of deceptive practices and consumer protection
  • Protection of human health or safety
  • Protection of the environment
Area
TBT: Technical product rulesTechnical barriers to trade
Notification type
Regular notification
Document symbol
G/TBT/N/SLV/244Latest notice: G/TBT/N/SLV/244/Add.1
ICS classification
  • 75.200 Petroleum products and natural gas handling equipment

Key dates

Distributed by the WTO
Comment deadline
Open until 17 November 2026
Proposed adoption
To be determined
Proposed entry into force
To be determined

How to comment

Comments on a notification go from government to government. If this measure affects your exports, send your comments to your country's WTO TBT enquiry point before 17 November 2026, quoting the document symbol G/TBT/N/SLV/244/Add.1 and how the measure affects your products. Your enquiry point forwards them to El Salvador.

Find your country's enquiry point on WTO ePing (opens in a new tab)

What the notification says

Latest notice (⁨G/TBT/N/SLV/244/Add.1⁩, 24 September 2026)

Salvadoran Technical Regulation (RTS) 75.02.04:26 - Natural gas network distribution systems. Design, construction, operation, maintenance, and abandonment or decommissioning

The purpose of this Addendum is to share the original text of Salvadoran Technical Regulation (RTS) 75.02.04:26 - 'Natural gas network distribution systems. Design, construction, operation, maintenance, and abandonment or decommissioning' as notified in document G/TBT/N/SLV/244.__________1 This information can be provided by including a website address, a PDF attachment, or other information on where the text of the final/modified measure and/or interpretative guidance can be obtained.

The notified Salvadoran Technical Regulation establishes the technical requirements for designing and building the infrastructure for natural gas network distribution systems, as well as the conditions for the operation, maintenance, inspection, and abandonment or decommissioning of those networks. It applies exclusively to natural gas network distribution systems and covers the following activities: - The design of piping installations in natural gas networks, up to the outer boundary of the residential service, at the point where they enter the metering and regulating box or cabinet. - The construction or repair of natural gas distribution networks or supply branches installed in the public right-of-way and operating at a maximum pressure of 4,200 kPa (42 bar). - The performance of work and the minimum safety conditions applicable to the construction, operation, and maintenance of natural gas distribution systems. It also establishes environmental protection requirements to be met during such work.

Notices on this measure

Every notice about this measure published here, newest first. Each one is the notifying member's own text.

  1. AddendumG/TBT/N/SLV/244/Add.1

    Salvadoran Technical Regulation (RTS) 75.02.04:26 - Natural gas network distribution systems. Design, construction, operation, maintenance, and abandonment or decommissioning

    The purpose of this Addendum is to share the original text of Salvadoran Technical Regulation (RTS) 75.02.04:26 - 'Natural gas network distribution systems. Design, construction, operation, maintenance, and abandonment or decommissioning' as notified in document G/TBT/N/SLV/244.__________1 This information can be provided by including a website address, a PDF attachment, or other information on where the text of the final/modified measure and/or interpretative guidance can be obtained.

  2. Regular notificationG/TBT/N/SLV/244

    Comment deadline: Open until 17 November 2026

    Salvadoran Technical Regulation RTS 75.02.04:26 NATURAL GAS DISTRIBUTION THROUGH NETWORKS. DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE AND ABANDONMENT OR DEACTIVATION.

    View original

    Reglamento Técnico Salvadoreño RTS 75.02.04:26 DISTRIBUCIÓN DE GAS NATURAL POR REDES. DISEÑO, CONSTRUCCIÓN, OPERACIÓN, MANTENIMIENTO Y ABANDONO O DESACTIVACIÓN.

    The notified Salvadoran Technical Regulation establishes the technical requirements for designing and building the infrastructure for natural gas network distribution systems, as well as the conditions for the operation, maintenance, inspection, and abandonment or decommissioning of those networks. It applies exclusively to natural gas network distribution systems and covers the following activities: - The design of piping installations in natural gas networks, up to the outer boundary of the residential service, at the point where they enter the metering and regulating box or cabinet. - The construction or repair of natural gas distribution networks or supply branches installed in the public right-of-way and operating at a maximum pressure of 4,200 kPa (42 bar). - The performance of work and the minimum safety conditions applicable to the construction, operation, and maintenance of natural gas distribution systems. It also establishes environmental protection requirements to be met during such work.

Sources

Expodite writes its summary from the official record. The notification and the documents it notifies are on the WTO's own websites.

All updates from El Salvador
  1. WTO notificationSPSProposed measure, open for comments

    Proposed measure from El Salvador: Coffee

    El Salvador notified this proposed SPS measure to the WTO on 7 October 2026. Comments are open until 6 December 2026.

    Symbol: G/SPS/N/SLV/154Comments until 6 December 2026

  2. WTO notificationTBTProposed measure, open for comments

    Proposed measure from El Salvador: Coffee

    El Salvador notified this proposed TBT measure to the WTO on 7 October 2026. Comments are open until 6 December 2026.

    Symbol: G/TBT/N/SLV/245Comments until 6 December 2026

  3. WTO notificationTBTProposed measure, not in force yet

    Proposed measure from El Salvador: Pharmaceutical products

    El Salvador notified this proposed TBT measure to the WTO on 28 August 2026. The comment period closed on 27 October 2026.

    Symbol: G/TBT/N/SLV/243Comment period closed

  4. WTO notificationSPSEmergency measure, may already applyEmergency

    DGG/DIR/316/06/2026

    In view of the notification referred to in official letter DGS-DTSA-519-2026 from the National Agriculture and Food Health and Safety Service (SAG-SENASA) of Honduras, and notification ID 7652 to the World Animal Health Organisation (WOAH) on high pathogenicity avian influenza (HPAI) in poultry…

    Symbol: G/SPS/N/SLV/153

All export regulation updates

Get these automatically for your products and markets.

Expodite matches each notification to the markets you export to and the HS codes of your products, and puts the ones that concern you in your Updates centre, with the date comments close.